
Solutions · 03
Solar + Storage + EV Charging
One EMS for on-site generation, storage and charging
Overview
Integrated energy for industrial parks and logistics hubs.
Rooftop and carport PV paired with behind-the-meter storage and DC fast charging, all dispatched by one energy management system — for on-site green power, peak shaving and charging revenue.
- Rooftop and carport PV
- 1 MWp
- Behind-the-meter storage
- 1 MW / 2 MWh
- DC fast chargers
- 10 × 120 kW
Typical configuration, shown as an example.
How it works
One EMS coordinates everything.
The energy management system dispatches PV, storage and charging together: solar is used on site first, storage shaves the peaks, and chargers draw the cheapest available power.
What we deliver
Scope of work.
- 01
On-site green power
Rooftop and carport PV supplies the facility and the chargers first, raising the share of solar used on site.
- 02
Peak shaving
Storage absorbs surplus solar and off-peak power, then discharges into load and charging peaks.
- 03
Charging revenue
DC fast charging for fleets, staff and visitors, coordinated with PV and storage by the EMS.
Applications
Where it fits.
- Industrial parks
- Logistics hubs
- Public buildings
- Commercial car parks
Projects
Delivered on the ground.

Wangjiang Solar Carport & EV Charging
Solar carport · PV + EV charging · Anqing, Anhui

Tongling Deyi Energy Solar Carport
1.5 MW · Solar carport · EPC turnkey · Tongling, Anhui

Start a project
Tell us about your site.
Share your location, load profile or bill of materials. We will recommend the right system and delivery model, based on a site assessment and financial modeling.

